Framing Solution Center

Build The Takeoff Before You Build The Structure

Calculate lumber, sheathing, openings, fasteners, and waste before material reaches the jobsite.

Build the takeoff Account for waste Package the job

Framing Calculator Command Center™

Run The Numbers. Build The Package.

Use practical framing estimators to establish the preliminary requirement, add the right allowance, and send the complete takeoff to a real human.

Project Orientation

What Are You Framing?

Wall Framing

Build the wall package.

Estimate studs, plates, and blocking for repeated wall runs.

Framing Workflow Intelligence™

Where Are You In The Work?

Choose the stage. Supply Haus will organize the products, equipment, documentation, and human support around the work in front of you.

Stage 01 — Plan & Estimate

Frame The Job Before The Lumber Arrives

Review the work, establish assumptions, and build the preliminary takeoff before material reaches the site.

Recommended System

  • Plan review & preliminary takeoff
  • Layout & waste planning
  • Layout & measuring
  • Delivery coordination

Approved plans, applicable code, and manufacturer requirements govern final structural selection.

Framing Concierge

The Calculator Gives You A Number. We Help Build The Answer.

Bring us the takeoff, the problem, or the plans. A Supply Haus framing human will help assemble the complete system.