Concrete Solution Center™ / Project Intelligence
Tell us what you're building. We'll build the concrete plan.
Enter the job once. The Concrete Project Planner™ connects volume, base, forming, reinforcement, curing, jointing, and the minimum material recipe—then sends the complete plan to a real Supply Haus human.
Project Intelligence / HEF-805
Build the plan before the truck arrives.
Calculated quantities, planning estimates, open decisions, and one complete Concierge request.
Step 01 / Project Recipe
What are you building?
Select the closest project. We will ask only the questions that affect that work.
Step 02 / Shared Job Profile
Describe the placement once.
These measurements feed every calculation that applies to the selected work.
We will never silently assume whether the pool is included in your stated dimensions.
This answer changes which measurements, calculations, and material groups apply.
Aggregate base is calculated only when full-depth work actually includes base replacement.
Pool / Opening
Subtract the opening from the outside footprint.
Curves, radii, coping, steps, equipment pads, islands, and irregular geometry require manual takeoff review.
Step 03 / Execution Choices
What do you already know about the build?
Unknown is an acceptable answer. The plan will preserve it for review instead of guessing.
Adaptive Slab Assembly
Build from the ground up.
Subgrade and base feed vapor protection, reinforcement supports, reinforcement, and the concrete placement. Only applicable slab work opens this gate.
Chair height, concrete cover, support class, spacing, upper-mat support, corrosion protection, and compatibility with the vapor barrier must follow the plans and selected support-system data.
Adaptive Finish Gate
Define only what changes the material recipe.
Coverage, application rate, compatible cure, sealer, tooling, timing, and maintenance requirements come from the selected manufacturer's current technical data. Decorative score lines do not replace required structural joints.
Drawing / Photo Intake
Give the Concierge the source—not just retyped dimensions.
Upload a plan PDF, take a phone photo of a drawing, share a field sketch, or provide a secure link. Extracted values never override your entered dimensions without confirmation.
Project upload reference
HEF805 Use this same reference in the upload form so the file and project plan stay together.The planner request carries the upload reference, document metadata, and any secure link. The file itself must be submitted through the configured upload form; Shopify's native contact form does not attach files.
Step 04 / Concrete Project Plan™
Your connected takeoff and execution recipe.
Review calculated quantities, estimates, assumptions, and unresolved decisions before sending.
Milk / Bread / Eggs
Required for execution
Triggered by the work
Conditional materials
Do not guess
Confirmation required
Review connected calculationsSee how one Job Profile fed every module
Concrete Volume
—Waiting for dimensionsAggregate Base
—Compacted planning volume; loose conversion requires material confirmation.Reinforcement
—Coverage basis only; design, laps, supports and spacing follow plans.Cure & Sealer
—Surface area basis; product coverage and compatibility govern containers.Edge Forming
—Preliminary perimeter; stakes, kickers, corners and reuse are field-dependent.Sawcut Plan
—Rectangular planning grid only.Joint Treatment
—Only designated joints receive sealant; joint-system details govern quantity.Bag Yield
—Uses nominal 0.60 ft³ per 80-lb bag; selected product data governs.Vapor System
—Roll and tape planning basis; selected system, seams, penetrations and terminations govern.Reinforcement Supports
—Preliminary chairs or bolster only; height, cover, spacing and support class follow plans.This is a preliminary material and execution plan—not an engineered design, approved mix, structural reinforcement schedule, drainage design, joint drawing, or product-compatibility determination. Plans, specifications, codes, manufacturers, engineers, inspectors, and field conditions govern.
Step 05 / Human Review
Send the complete project—not a vague message.
Your dimensions, quantities, recipe, assumptions, and unresolved questions will travel together.